功果桥(苗尾)水电站鱼类增殖站设计中的若干关键技术初探 |
Key Techniques of Fish-Hatchery Designing on the Gongguoqiao & Miaowei Hydropower Station |
|
DOI: |
中文关键词:增殖放流站 设计 关键技术 功果桥水电站 苗尾水电站 |
英文关键词:Fish hatchery structure Design Key technic Gongguoqiao & Miaowei hydropower station |
基金项目: |
|
摘要点击次数: 2682 |
全文下载次数: 1198 |
中文摘要: |
鱼类人工增殖放流是水电工程建设中鱼类资源保护与恢复的有效手段,正逐步应用于我国大、中型水电工程项目的生态环境保护。以功果桥和苗尾水电站鱼类增殖站设计为例,概述了鱼类增殖站的工艺设计流程,初步探讨了增殖放流规模、亲鱼数量和各类培育设施参数的确定等关键技术问题,并对今后的研究方向提出了建议。 |
英文摘要: |
Artificial - based fish multiplication and liberation is one of the most efficient ways for sustaining fish population, and is carrying out in the much more hydropower stations in China. In this paper, we took the Gongguoqiao & Miaowei hydropower station as an example, and aimed to briefly introduce the design process of fish hatchery. The key techniques including the multiplication and liberation size, the parent fish amounts, and the all kinds of breed facilities, were discussed, and the expected research direction was put forward. |
施家月,廖琦琛,梁银铨,吕巍,汤优敏.2009.功果桥(苗尾)水电站鱼类增殖站设计中的若干关键技术初探[J].水生态学杂志,30(6):51-56. |